Home
Home > Missions > Civil Works > Planning > Project Reports

Project Reports

1 2 3 4 5 6 7 8 9 10 ... 19


Draft Environmental Assessment - Snake Creek Embankment Interim Risk Reduction Measures - 5/16/2018: The preferred alternative outlined in the EA includes updating the current Lake Audubon Water Control Plan with a provisional operating restriction to manage lake level differences between Lake Sakakawea and Lake Audubon during drought conditions.
Expiration date: 7/20/2018

ATTACHMENTS:  


Draft Environmental Assessment - West Williston Flood Risk Reduction Project - 4/30/2018: The draft EA evaluates the environmental impacts of implementing a project that reduces the threat of flooding to the city of Williston, ND from the Bell and Handy Andy watersheds and Sand Creek.
Expiration date: 5/30/2018

ATTACHMENTS:  


Draft Environmental Assessment - Pick City, ND Sanitary System Improvement - 3/19/2018: The draft EA evaluates the environmental impacts of expanding two existing treatment cells and constructing a third treatment cell in order to increase the overall storage and treatment capacity of the wastewater treatment facility in Pick City, ND.
Expiration date: 4/17/2018

ATTACHMENTS:  


Draft Integrated Feasibility Report/Environmental Assessment - Deadmans Run Section 205 Flood Risk Management Study - 3/19/2018: The draft report provides information on the need for the project, current conditions of the project area, identification of opportunities to reduce flood risk, development of various alternatives to reduce flood impacts to life safety and property along Deadmans Run and selection of the proposed plan.
Expiration date: 4/20/2018


Draft Environmental Assessment for Modifications to Federal Levee Systems R-616-613 and R-613 - 3/7/2018: The purpose of the proposed project is to modify two levee systems (R-616-613 and R-613) in order to meet FEMA certification and accreditation standards and continue eligibility in the Corps’ PL 84-99 Emergency Levee Rehabilitation Program.
Expiration date: 4/6/2018

ATTACHMENTS:  


1 2 3 4 5 6 7 8 9 10 ... 19