1 2 3 4 5 6 7 8 9 10 ... 19


Draft Supplemental Environmental Assessment - MHA Cultural Interpretive Center Project - 3/1/2018: The draft supplemental environmental assessment for the MHA Cultural Interpretive Center located on the Fort Berthold Indian Reservation in McKenzie County, North Dakota evaluates the environmental impacts of increasing the project footprint by approximately four acres.
Expiration date: 3/31/2018


Draft Integrated Feasibility Report/Environmental Assessment - Sheridan, Wyoming Section 1135 Ecosystem Restoration Study - 2/9/2018: The draft feasibility report/environmental assessment outlines a proposed plan to restore approximately three miles of degraded ecosystem along the Goose Creeks in Sheridan, Wyoming. The plan includes in-stream structures to improve cold water fishery habitat, stream modifications to increase fish passage and restoration of wetland habitat adjacent to the creeks.
Expiration date: 3/12/2018


Draft Supplemental EA - Garrison Master Plan Management Unit 100 Land Classification Change for ND ARNG Williston Training Site - 1/22/2018: The draft supplemental environmental assessment evaluates impacts of reclassifying land use of approximately 109 acres at the Garrison Project in North Dakota. Management Unit 100, also known as Dakota Hills Christian Camp (Camp Cherith), would be reclassified from Recreation to Multiple Resource Management – Low Density Recreation.
Expiration date: 2/20/2018

ATTACHMENTS:  


Draft Environmental Assessment - Wastewater Treatment Facility Improvements Project, Dakota City, Nebraska - 12/12/2017: The draft EA evaluates the environmental impacts of replacing an existing wastewater treatment plant, which has exceeded its lifespan, with a new wastewater treatment plant and associated outlet structure south of Dakota City, Nebraska.
Expiration date: 1/10/2018

ATTACHMENTS:  


Draft EA - PL 84-99 Levee Rehabilitation Program, L-575, Fremont County, Iowa - 11/28/2017: The draft EA evaluates the environmental impacts of repairing damage to the levee caused by high flows in May 2017. Repairs would include replacing lost earthen material along the riverside levee toe and compacting it to the appropriate slope along with planting grass seed via drill seeding and placing an erosion control blanket until vegetation is established.
Expiration date: 12/28/2017