Missouri River Water Management News

Missouri River Water Management News Releases are available on the Northwestern Division website.RSS Feed

Chatfield Reservoir Storage Reallocation Reports available for public review

Published Aug. 2, 2013
Chatfield Dam was the second of three dams built to reduce flooding risks in the Denver area. Located southwest of Denver on the South Platte River, construction of the dam was begun in 1967 and was completed in 1975.

Chatfield Dam was the second of three dams built to reduce flooding risks in the Denver area. Located southwest of Denver on the South Platte River, construction of the dam was begun in 1967 and was completed in 1975.

OMAHA, Neb. – In accordance with the National Environmental Policy Act of 1969, as amended, the U.S. Army Corps of Engineers has prepared a Final Feasibility Study / Environmental Impact Statement for the Chatfield Reservoir Storage Reallocation, Littleton, Colo.

The final report identifies and compares four main alternatives and outlines in detail the preferred alternative for reallocating storage space in the Chatfield Reservoir for joint flood control- conservation purposes, including storage for municipal and industrial water supply, agriculture, environmental restoration and recreation and fishery habitat protection and enhancement. The National Environmental Policy Act of 1969 requires the Corps to assess and report the socio-economic and environmental effects of reallocating storage for these purposes.
     
“Extensive coordination with Colorado Department of Natural Resources, the project sponsor, and water providers occurred throughout this project to complete the final report. Representatives from federal, state, local governments and nongovernmental groups such as the Sierra Club and Audubon Society as well as members of the public provided substantial input into the development of this project and provided comments on the draft report. This input was taken into consideration to prepare the final document,” said Gwyn Jarrett, project manager.

The public is encouraged to review the final report and environmental impact statement during the open comment period from Aug. 2, 2013 to Sept. 1, 2013.

BACKGROUND: Population growth within the Denver, Colo., metropolitan area continues to create a demand on water providers. Colorado’s population is projected to be between 8.6 and 10.3 million in 2050. The Statewide Water Supply Initiative, commissioned by the State Legislature, estimates that by 2050, Colorado will need between 600,000 and 1 million acre-feet/year of additional municipal and industrial water. There is also a strong need for additional water supplies for the agricultural community in the South Platte Basin as thousands of acres of previously irrigated land has not been farmed in recent years due to widespread irrigation well curtailments.
    
The purpose and need of the Chatfield Reservoir Storage Reallocation Study is to increase availability of water, sustainable over the 50-year period of analysis, in the greater Denver area so that a larger proportion of existing and future (increasing) water needs can be met. 
      
The final Chatfield Reservoir Storage Reallocation Feasibility Study Report and Environmental Impact Statement is available for viewing at: http://cdm16021.contentdm.oclc.org/cdm/ref/collection/p16021coll7/id/10 and in hardcopy at the following locations:

  • Highlands Ranch Library, 9292 Ridgeline Blvd., Highlands Ranch, CO  80129, (303) 647-6642
  • Colorado Water Conservation Board, 1313 Sherman Street, Room 721, Denver, CO  80203, (303) 866-3441
  • Columbine Library, 7706 West Bowles Avenue, Littleton, CO  80123, (303) 235-5275
  • ‎Lincoln Park Library, 919 7th Street, Suite 100, Greeley, CO  80631, (970) 546-8460
  • Aurora Public Library, 14949 E. Alameda Parkway, Aurora, CO  80012, (303) 739-6600
  • U.S. Army Corps of Engineers, Tri-Lakes Project Office, 9307 S. Wadsworth Blvd., Littleton, CO  80128

Written comments should be sent to: U.S. Army Corps of Engineers, Omaha District; CENWO-PM-AA; ATTN: Chatfield Reservoir Storage Reallocation FR/EIS; 1616 Capitol Avenue; Omaha, NE 68102-4901. Comments can also be emailed to: chatfieldstudy@usace.army.mil.

Comments must be postmarked or received no later than Sept. 1, 2013. 


Contact
Omaha District Public Affairs
402-995-2417
or
Gwyn Jarrett
gwyn.m.jarrett@usace.army.mil

Release no. 20130802-002