Summary: The proposed project consists of excavation and dredging of approximately 566,000 cubic yards of silty sand to create a 4,500-foot long top-width widening (TWW) project that interfaces with the main channel of the Missouri River.
Geographic Scope: This project is located approximately 2 miles east of the town of Nemaha, Nebraska between River Miles 529 and 532 on the Langdon Bend reach of the Missouri River.
Impacts: None
Decision/Date: Made following close of public comment period.