Results:
Archive: August, 2021
Clear
  • August

    USACE completes new high-altitude research laboratory on Pikes Peak

    The Army’s new high-altitude research laboratory at the top of Pikes Peak in Cascade, Colorado, was officially completed on July 1, and is the highest facility of its kind in North America. Built by members from the U.S. Army Corps of Engineers, Omaha District’s Ft. Carson Resident Office team for the U.S. Army Research Institute for Environmental Medicine, this new lab will greatly enhance research to optimize Soldiers’ health and strengthen today’s warfighter.
  • Air Force Academy, USACE break ground on new cyber facility

    The Stillman parade field on the U.S. Air Force Academy in Colorado Springs, Colorado, was the site of a groundbreaking ceremony Aug. 6 for the new Madera Cyber Innovation Center. U.S. Air Force Academy Superintendent, U.S. Air Force Lt. Gen. Richard M. Clark hosted the afternoon event before a group of Servicemembers, distinguished guests and civilians.

News from around USACE

Army Corps Civil Engineer Still Puts in the Hours at 92
5/26/2024
It takes a special person to be in the workforce after age 90. The New York District of the U.S. Army Corps of Engineers has one: Ronald St. Laurent, a civil engineer in the Design Branch of...
Army Corps Expansion of Historic West Point Cemetery Complete
5/26/2024
The New York District of the U.S. Army Corps of Engineers, along with officials from the U.S. Military Academy at West Point, New York, Army Corps North Atlantic Division (Brooklyn, NY), the Office of...
Army Corps Expediting Coastal Repairs on Long Island; Sand Placement Expected This Fall
5/26/2024
The U.S. Army Corps of Engineers, New York District, has received funding for planning and design for emergency sand placement on Long Island’s Fire Island (50 miles east of New York City) following a...
It could have been so much worse: How the Pittsburgh District prevented six feet of water from reaching downtown
5/24/2024
The U.S. Army Corps of Engineers Pittsburgh District faced back-to-back high-water events due to heavy rains in April, holding back an estimated six feet of flooding from reaching the Point of...