R520 Levee Restoration Information

Relative to what gauge location: XXXXX
Background: Levee was overtopped/breached on or before 19 Mar 2019
Current actions: District Team waiting for waters to recede to assess damage, preparing contract, interim measures
Anticipated construction start: TBD
Cost: TBD
Contractor: TBD
Risk to normal Spring Runoff operations? Yes
Risk to elevated Spring Runoff operations? Yes
UPDATED: 4/4/19

R520 Imagery

Photo documents an aerial view of levee R520 near Rulo, Nebraska pre-overtopping Mar. 16, 2019, resulting from major runoff event earlier in the month. (Photo by USACE, Omaha District)

NOAA River Level Observations & Forecasts

UNDER CONSTRUCTION

NOAA Water Gauge Levels

Restoration Activities Timeline

Activity Date
   
   
   
   
   
   
   
   
   

Video Gallery

Video by Delanie Stafford
Out with the old, in with the new: Bulkhead gates at Gavins Point Dam replaced for the first time
U.S. Army Corps of Engineers, Omaha District
Nov. 14, 2024 | 1:35
A video news story covering the replacement of six draft tube bulkhead gates at the Gavins Point Dam hydroelectric powerhouse for the first time ever.
More