Background: xxxxxxxxxx
Current Action: xxxxxxxxxxx
|
Initial Breach Repair #1 –
|
Initial Breach Repair #2 –
|
Contractor |
|
|
Contract Amount |
|
|
Contract Award |
|
|
Construction Start |
|
|
Estimated
Completion |
|
|
Next Steps:
- Provide an interim level of flood risk management at both initial breach repair locations.
- Conduct physical damage assessment when water levels recede and the levees are accessible
- Design and construct levee rehabilitation to authorized level of flood risk management.