The District Engineer is evaluating a proposal by the City of Bismarck, North Dakota to construct the Boulder Ridge Stormwater Project. The project would impact 1 acre of wetland/tributary to Hay Creek by installing stormwater pipe, constructing a detention pond, cleaning out and widening the existing channel and installing 200 feet of perforated pipe under the channel to remove groundwater. Work would occur in Section 16, Township 139 North, Range 80 West at Latitude: 46.856174 degrees North, Longitude -100.786378 degrees West in Bismarck, Burleigh County, North Dakota.