Memo from the Director of Contracting re: COVID-19

Published March 17, 2020

For USACE Contractors, As the Director of Contracting for the U. S. Army Corps of Engineers, I wanted to personally reach out to all of you and let you know that we are actively monitoring the situation in regards to the novel coronavirus disease (COVID-19). Attached is the guidance we received on planning for potential Novel Coronavirus Contract Impacts. Please read the attachment, and if you have any questions or concerns how this situation affects your project(s), please reach out to your respective Contracting Officer for assistance. My Point of contact for this memorandum is John A. Jacobson at (202) 761- 8817 or John.A.Jacobson@usace.army.mil 
Released by:
JILL E. STIGLICH
Director of Contracting


News from around USACE

Fort Peck breathes new life into two butterfly valves
1/23/2026
The U.S. Army Corps of Engineers, Omaha District, is overseeing the rehabilitation of two 65-year-old, 216-inch diameter, 135,000-pound butterfly valves inside Powerhouse 2 at the Fort Peck Dam in...
ERDC dedicates new supercomputer in honor of Medal of Honor recipient
1/22/2026 UPDATED
VICKSBURG, Miss.— The U.S. Army Engineer Research and Development Center (ERDC) is home to some of the world’s most powerful high-performance computing systems, which recently have been named to honor...
USACE Announces Temporary Halt of Water Releases from Gathright Dam for Routine Inspection of Outlet Tunnel
1/22/2026
COVINGTON, VA—The U.S. Army Corps of Engineers (USACE) Norfolk District will temporarily halt water releases from the Gathright Dam for a routine inspection of the outlet tunnel. The halt will occur...
Herd Highlight: Scott Sterling, natural resources specialist and piping plover preservationist
1/22/2026
Meet Scott Sterling, a natural resources specialist at the Garrison Project in North Dakota, and one of only two Omaha District specialists trained to capture and relocate piping plover chicks and...