USACE Omaha District Photos

Salt Creek 8 (Wagon Train) Plunge Pool looking toward the dam from the downstream outlet channel
Salt Creek 8 (Wagon Train) Plunge Pool near Lincoln, Nebraska looking toward the dam from the downstream outlet channel. The U.S. Army Corps of Engineers will repair both the left and right side of the plunge pool. Note on the left side of the picture there is no riprap and undersized rip rap on the right side. Both the left and right sides of the pool will be repaired. The pipe is the conduit pipe that outlets the reservoir water into the plunge pool, May 25, 2021.

Download Image: Full Size (1.44 MB)
Photo by: Courtesy Photo |  VIRIN: 210817-A-A1408-0001.JPG