USACE Omaha District Photos

L-575 levee system repairs, Feb. 29, 2020
As of February 29, 2020, the entire L-575 levee system has been returned to full height. Continued repair activities will focus on restoring the levee system to its pre-flood condition.

Download Image: Full Size (1.77 MB)
Tags:
Photo by: U.S. Army Corps of Engineers Omaha District |  VIRIN: 200229-A-RI866-003.JPG