USACE Omaha District Photos

L-550 "G" Breach
The team continues to place approximately 11,000 -14,000 cubic yards of material a day at the L-550 “G” Breach in an effort to have an interim breach closure at this location by the first of March.

Download Image: Full Size (0.55 MB)
Tags:
Photo by: U.S. Army Corps of Engineers Omaha District |  VIRIN: 200210-A-RI866-001.JPG