Cavitation repairs at Gavins Point Dam
The scaffolding platform reaches first across the draft tube from the door and then builds out geometrically from the center structure. The hexagonal structure connects to anchor brackets on the draft tube wall and then supports a deck surface, which will accommodate scaffolding to provide safe access to the areas where cavitation impacts the turbine blade and the draft tube liner.