Royal Bridge installing containment system at the emergency spillway gates at Fort Randall Dam to contain the water blasting spray. The gates were water blasted to remove the paint to allow inspection of the welds on the gates. This part of the Disaster Relief Appropriations Act, 2012 (DRAA) funded efforts to repairs dams to the dams as a result of the 2011 Flood.