USACE Omaha District Photos

Flood Repairs along the Missouri River
Seven contracts were awarded in 2012 to repair damages at Big Bend Dam. They include repair of gates, upstream riprap, relief well outfalls, and rehabilitation of spillway concrete. The gate repair contractor is on-site and has begun repairs including replacing trunnion covers on gates at Big Bend.

Download Image: Full Size (0.07 MB)
Tags:
Photo by: U.S. Army Corps of Engineers, Omaha District |  VIRIN: 130909-A-CE999-412.JPG