USACE Omaha District Photos

Flood Repairs along the Missouri River
The plunge pool repair contractor at Fort Peck, Mont., continues to work on slope excavation on east and west sides of the spillway. Horizontal anchor drilling has begun. The gate repair is scheduled for completion in early 2015. The plunge pool repair is scheduled for completion in December 2015.

Download Image: Full Size (5.38 MB)
Tags:
Photo by: U.S. Army Corps of Engineers, Omaha District |  VIRIN: 130909-A-CE999-411.JPG