Project Reports

Results:
Tag: oil and gas
Clear
  • Garrison Dam/Lake Sakakawea Draft Oil and Gas Management Plan and PEA

    Expiration date: 5/22/2020

    The draft oil and gas management plan and programmatic environmental assessment outlines the process and requirements, including National Environmental Policy Act (NEPA) requirements, necessary to apply for a real estate outgrant to conduct oil and gas exploration and/or extraction activities on Garrison Project lands.

  • Draft EA - ND Line 84 Geohazard Remediation Project

    Expiration date: 6/14/2019

    The draft EA evaluates the proposed rehabilitation of a segment of an 8-inch diameter steel crude oil pipeline, Line 84, owned and operated by the North Dakota Pipeline Company LLC (NDPL), near the City of Trenton in Williams County, North Dakota. As the proposed project would require crossing lands associated with US Army Corps of Engineers (Corps) managed real estate, a Section 408 permit and a real estate easement are required.

  • Dakota Access Pipeline Environmental Assessment

    Expiration date: 1/8/2016

    An environmental assessment has been prepared to evaluate potential environmental impacts from construction and operation of a crude oil pipeline across private lands encumbered by federal flowage easements and federal land managed by the U.S. Army Corps of Engineers.