USACE Omaha District Photos

Post Chapel Fort Randall
With assistance from the National Park Service Historic Preservation, the Omaha District designed and built a roof structure over the chapel. The project won a U.S. Army Corps of Engineers Design Team of the Year award in 2006. The project also included dismantling sections of the chapel that were unsafe or unstable, replacing degraded masonry sections, and tuck pointing joints to prevent further water damage.

Download Image: Full Size (1.57 MB)
Photo by: U.S. Army Corps of Engineers |  VIRIN: 090429-A-CE999-440.JPG