Missouri River Water Management News

Missouri River Water Management News Releases are available on the Northwestern Division website.RSS Feed

Results:
Category: Oahe
Clear
  • Missouri River Mainstem Water Reallocation study deadline ends Sept. 28

    During meetings held to announce the results of Draft Surplus Water reports for five of the six Missouri River Mainstem Reservoirs Aug. 20 to Aug. 29, the U.S. Army Corps of Engineers, Omaha District, concurrently began the scoping process for the reallocation study for the Missouri River Mainstem System.
  • Comment period extended for Missouri River Mainstem Reservoir Surplus Water Reports

    In response to requests from the public during meetings held throughout the Missouri River basin from Aug. 20 to Aug. 29, the U.S. Army Corps of Engineers, Omaha District, is extending the public comment period for the five Draft Missouri River Mainstem Reservoir Surplus Water Reports and Environmental Assessments to Oct. 10, 2012.
  • Corps seeks public comment on Draft Surplus Water Reports, Environmental Assessments

    A report has been developed and released for public comment for each of the following mainstem reservoirs: Fort Peck Dam/Fort Peck Lake, Mont.; Oahe Dam/ Lake Oahe, S.D., Big Bend Dam/Lake Sharpe, S.D.; Fort Randall Dam/Lake Francis Case, S.D.; and Gavins Point Dam/Lewis and Clark Lake, S.D. The draft reports identify and quantify surplus water availability at each of the locations.