An official website of the United States government
Here's how you know
Official websites use .mil
A
.mil
website belongs to an official U.S. Department of Defense organization in the United States.
Secure .mil websites use HTTPS
A
lock (
lock
)
or
https://
means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.
Skip to main content (Press Enter).
US Army Corps of Engineers
Omaha District Website
®
About
Leadership
Tribal Nations
Centers of Expertise
Fueling Systems (POL-MCX)
Interior Design
Rapid Response
References
Protective Design Center
PDC Training
secengg
Humprey Eng Center
ECF-ACP
blast
SCIF
PDC Library
PDC Software
Contacts
Services
FAQ
Locations
District Offices
Colorado
Iowa
Minnesota
Missouri
Montana
Nebraska
North Dakota
South Dakota
Wisconsin
Wyoming
USACE Locations
Recreation Areas
Business With Us
Contracting
Quality Management
OPSEC for Contractors
Small Business
Real Estate
Missions
Civil Works
Tribal Nations
Cultural Resources
Agreements
Programmatic Agreement
Documents
Meetings
Laws and Regulations
Planning
Project Authorities
Request Letters
Project Agreements
Planning Projects
Environmental Planning
Public Involvement Notices
Project Reports
Review Plans
Recreation
Section 408
Dam and Levee Safety
Missouri River Recovery Program (MRRP)
Fort Peck Test Flows
Military Missions
Regulatory Program
Colorado
Mitigation
Jurisdictional Determination
Regional General Permits
Public Notices
EIS - Moffat
EIS - NISP
EIS - Halligan
EIS - Windy Gap Firming
Montana
Nationwide Permits
Mitigation
Wetlands
Jurisdictional Determination
Regional General Permits
Public Notices
EA - Upper Yellowstone River
Nebraska
Mitigation
Permittee Responsible
Third Party
Jurisdictional Determination
Regional General Permits
Public Notices
EIS - Highway 12
EIS - US 275
Nationwide Permit Information -Nebraska
North Dakota
Mitigation
Jurisdictional Determination
Regional General Permits
Public Notices
South Dakota
Mitigation
Jurisdictional Determination
Regional General Permits
Public Notices
Wyoming
Nationwide Permits
Mitigation
Jurisdictional Determination
Regional General Permits
Public Notices
Permits
Nationwide Permit Information
Special Projects
Fueling Systems (POL-MCX)
Emergency Management
Disaster Preparedness
Emergency Operations
Flood Control Works
The Rehabilitation Program
Interim Policy on Rehabilitation Assistance Eligibility
System-Wide Improvement Framework
Alterations to Flood Risk Reduction Projects
Emergency Support Function #3
Environmental
Environmental Planning
FUDS
Dam and Lake Projects
Missouri River Dams
Fort Peck
Garrison
Oahe
Big Bend
Fort Randall
Gavins Point
Summary of Decisions
Missouri River Navigation
Tri-Lakes Projects
Bear Creek Dam
Bear Creek Gate Replacement Information
Chatfield Dam
Cherry Creek Dam
Salt & Papio Creeks
Pipestem Dam & Lake, North Dakota
Additional Dams & Lakes
Water Safety
Environmental Stewardship
Oil and Gas Development
Dakota Access Pipeline
DAPL Public Comments
Hydropower
Lake Data & Portage
Project Master Plans
Water Information
Water Control
James River Basin
Cherry Creek WCPM
Water Quality
Policy
Management
Priority
Monitoring
Reports
Careers
Media
News Stories
News Releases
Regulatory Public Notices
Social Media
Fact Sheets
Decision Letter
Videos
Images
Library
Contact
USACE Office Locator
FOIA
RSS
Home
/
Media
/
News Releases
Missouri River Water Management News
Missouri River Water Management News Releases
are available on the Northwestern Division website.
News Release Archive
2025 (8)
2024 (34)
2023 (37)
2022 (45)
2021 (68)
2020 (102)
2019 (150)
2018 (88)
2017 (110)
2016 (78)
2015 (84)
December (7)
November (4)
October (10)
September (5)
August (5)
July (13)
June (18)
May (7)
April (7)
March (2)
February (1)
January (5)
2014 (80)
2013 (92)
2012 (41)
2011 (3)
2010 (1)
Results:
Archive:
April, 2015
Clear
24
Apr 2015
Temporary Closure of East Tailrace Recreation Area at Garrison Dam
The road to the East Tailrace Recreation Area downstream of the Garrison Dam in Riverdale, N.D. will be closed on April 27 and April 28 between the hours of 7 a.m. and 7 p.m. This closure is required to allow sedimentation removal from the downstream boat ramp. The road to the East Tailrace will be closed during this time. Shore fishing at the East Tailrace will not be permitted. Shore fishing will remain available at the West Tailrace. Signs will be in place to direct the public. Access to the East Tailrace will reopen once the work is completed.
20
Apr 2015
Public meetings scheduled for Denver Urban Waterways Restoration Study
The U.S. Army Corps of Engineers, in cooperation with the city and county of Denver, will hold three public meetings to gather input on the recently initiated Denver Waterways Restoration Study. The purpose of the study is to identify ecosystem restoration and flood risk reduction opportunities along critical areas of the South Platte River from 6th Avenue to 58th Avenue and flood-prone areas of Harvard Gulch and Weir Gulch.
17
Apr 2015
Ecosystem restoration study public meeting scheduled for Sheridan, WY
The U.S. Army Corps of Engineers, in cooperation with the city of Sheridan, Wyo., will hold a public meeting on Thursday, April 30, 2015 at the Best Western, 612 N. Main Street, to gather input on an ecosystem restoration feasibility study in Sheridan. The public meeting will run from 5:30 to 7 p.m. with a brief presentation describing the study followed by an open house.
16
Apr 2015
Commander signs FONSI for Yellowstone Intake Diversion Dam Modification
Omaha District Commander Col. Joel R. Cross and Bureau of Reclamation, Great Plains Region, Montana Area Manager Brent Esplin have signed the Finding of No Significant Impact for the Lower Yellowstone Intake Diversion Dam Modification Project. The FONSI summarizes the environmental effects associated with the project and the decision of the co-lead agencies to select and implement the bypass channel alternative.
13
Apr 2015
Spring release plans for Jamestown and Pipestem reservoirs
Pipestem Reservoir is currently at pool elevation 1445.0 feet, which results in 1.7 percent of the flood pool occupied. Inflows are currently 40 cubic feet per second (cfs) with no reservoir release. Jamestown Reservoir is currently at pool elevation 1430.0 feet, which is one foot below the base of the flood pool. Inflows are currently 10 cfs with no reservoir release. The maximum combined release from the reservoirs is not expected to exceed 200 cfs; however, significant rainfall could necessitate higher release levels. The upper James River basin is currently in abnormally dry to moderate drought conditions according to the US Drought Monitor, which could decrease rainfall runoff into the reservoirs.
9
Apr 2015
Partial road closure will have limited impact on traffic
Maintenance on street lights across Gavins Point Dam will cause a partial road closure on Crest Road from Monday, April 13 at 8 a.m. through Friday, April 17 at 5 p.m.
6
Apr 2015
Lewis and Clark Visitor Center will be closed April 7 and 8
The Lewis and Clark Visitor Center near Yankton, SD will be closed on Tuesday, April 7 and Wednesday, April 8th.