Out with the old, in with the new: Bulkhead gates at Gavins Point Dam replaced for the first time
A contractor from Transco Industries Inc. modifies a metal strap from a draft tube bulkhead gate at the Gavins Point Dam powerhouse October 22, 2024. The new gate replaced an original gate from 1957 in accordance with lifecycle specifications. (U.S. Army Corps of Engineers photo by Delanie Stafford)