Dam safety remains top priority admist COVID-19 challenges
Narturi Narciso, engineer in training, U.S. Army Corps of Engineers, Omaha District, exits a conduit at Salt Creek Site 2, Olive Creek Dam, Neb., after conducting a structural inspection May 1. Kristle Beaudet, dam safety manager, assists with the equipment and documentation. This was the first inspection the dam safety program conducted since the COVID-19 pandemic began.