USACE Omaha District Photos

Cavitation repairs at Gavins Point Dam
Project crew members, Cody Wilken and Dale Stibral carry a piece of the scaffolding platform for installation in the draft tube.

Download Image: Full Size (1.44 MB)
Tags: Gavins point
Photo by: Eileen L. Williamson |  VIRIN: 140122-A-RO090-180.JPG