NWO-2007-02353-BIS

CENWO-ODR-ND
Published June 3, 2024
Expiration date: 6/20/2024
The District Engineer, Omaha District, is evaluating a permit application from the City of Bismarck for the Tyler Coulee Regional Stormwater Improvements Project. The City proposes to upgrade flow passage and check erosion at road crossings on Valley Drive, Clairmont Road and River Road; construct four dry detention basins to reduce peak flow; and upgrade the berms on either side of the channel as it goes through Pioneer Park. Construction of the project would result in the permanent loss of 0.78-acre of waters of the US. The project site is located in northwest Bismarck on Tyler Coulee in Sections 17, 18, 19, 20, 25, 29 and 30, Township 139 North, Range 80 West, centered on Latitude 46.853180° North, Longitude -100.813689° West, Bismarck, Burleigh County, North Dakota.