The District Engineer (Omaha) is evaluating a site plan submitted by Ducks Unlimited, Inc. (DU) to add as an addendum to their North Dakota Aquatic Resource In-Lieu Fee Program Instrument approved on March 5, 2014. The Turtle Mountain In-Lieu Fee Mitigation Site (Site) is located one mile west of Willow Lake National Wildlife Refuge and 10 miles northeast of Dunseith in the NE¼ of Section 13 and NE¼ of Section 24, Township 163 North, Range 74 West at Latitude 48.93583° North, Longitude -100.18822° West, Bottineau County, North Dakota. DU estimates that the Site would generate 38.53 credits. Credits would be achieved primarily through restoration of wetlands, with additional credits for enhancement, creation and preservation of wetlands and minimal credit for uplands. The Regional Service Area for the Site would be the Souris River Basin Zone.