NWO-2017-01039-WEH

US Army Corps of Engineers, Omaha District, Nebraska Regulatory Office
Published Sept. 21, 2021
Expiration date: 10/6/2021
Papio-Missouri River NRD - The project consists of constructing a dam site on West Papillion Creek, known as Dam Site 12 (DS-12). The proposed DS-12 structure would be an earthen embankment approximately 1,050 feet in length and approximately 28 feet above the valley floor (approximately 33 feet above channel bottom). This structure would require approximately 115,100 cubic yards of clean fill material, with 394 cubic yards below the Ordinary High Water Mark. The drainage basin area of DS-12 would be approximately 1,660 acres (2.6 square miles). The top-of-dam limits would exist at an elevation of 1,222 feet. DS-12 characterized with a normal pool elevation of 1,206 feet and a permanent pool of 43 acres reservoir. Two water quality basins, one located northwest of the DS-12 and a second located between the existing 216th Street alignment and proposed 216th Street realignment, for water quality benefits to the reservoir. Reduction in the 100-year peak flow at DS-12 from approximately 2,480 cfs to 300 cfs at the outflow of the principal spillway. The construction of DS-12, water quality basin structures and the realignment of 216th Street will permanently impact (filling and inundation) a total of 9.672 acres of wetlands consisting of 4.34 acres of PEMA/C riverine channel, 5.33 acres of PEMA/C riverine floodplain, and 0.002 acres of PFOA riverine floodplain. The construction of DS-12, water quality basin structures and the realignment of 216th Street will permanently fill a total of 719 linear feet of West Papillion Creek and inundate a total of 5,608 linear feet of West Papillion Creek.