Missouri River Water Management News

Missouri River Water Management News Releases are available on the Northwestern Division website.RSS Feed

Results:
Category: Planning Projects
Clear
  • Public information meeting scheduled for Snake Creek Dam Safety Modification Study

    The USACE, Omaha District will host a meeting on Feb. 16, 2023, to inform the public on its findings of the 2022 Snake Creek Dam Modification Study and the preferred alternative. The public is encouraged to attend and provide input. The meeting will be held on from 5:30-7:00 pm (CST) at the Snake Creek Pumping Plant, 1401 Highway 83 NW Coleharbor, N.D. 58531.
  • Public meeting scheduled for Watertown Flood Risk Management Feasibility Study

    OMAHA, Neb. — The U.S. Army Corps of Engineers, Omaha District in cooperation with the city of Watertown, South Dakota, will hold a public meeting on Tues., Jan. 31, 2023, at 1901 Ninth Ave. SW in Watertown. The purpose of the meeting is to share information on the recently initiated flood risk management feasibility study. The study location includes the Big Sioux River and its tributaries within the vicinity of the Watertown community.
  • Public meeting scheduled for Little Goose Creek general investigations study

    The U.S. Army Corps of Engineers, in cooperation with the city of Sheridan, Wyoming, will hold a public meeting on Wed., Jan. 11, 2023, at 612 North Main Street in Sheridan. The purpose of the meeting is to share information on the recently initiated general investigations feasibility study. The study location is within downtown Sheridan within the concrete lined portion of the Little Goose Creek channel (approximately 1,700 linear feet of the channel).
  • U.S. Army Corps of Engineers Issues Section 404 Permit Authorizing Fill Discharge Associated with Northern Colorado Water Conservancy District’s Northern Integrated Supply Project

    Today, the US Army Corps of Engineers signed a record of decision for the Northern Colorado Water Conservancy District’s request to discharge fill material into 33.6 acres of waters of the United States. The fill discharge will facilitate construction activities associated with their Northern Integrated Supply Project (NISP).
  • Virtual public meeting scheduled for flood risk management study in Fremont.

    The U.S. Army Corps of Engineers in cooperation with the Lower Platte North Natural Resources District and the city of Fremont, will hold a virtual public meeting Jan. 13, from 7-9 p.m. via Zoom meeting ID 95037694771 to discuss results of the flood risk management study outlined in the recently released draft feasibility report.
  • Corps seeks input for Papio Lakes master plan revision

    The U.S. Army Corps of Engineers, Omaha District, invites the public to provide input and make comments for the upcoming master plan revision of the Papillion Creek and Tributaries Lakes project - better known as the Papio Lakes. This project consists of: Glenn Cunningham Lake, Standing Bear Lake, Wehrspann Lake, and Zorinsky Lake, all located in the Omaha metropolitan area.
  • Corps awards contract to complete levee repairs on the Missouri River L-536 levee system north of Corning, Missouri

    U.S. Army Corps of Engineers,  Omaha District, awarded a $8.74 million construction contract to AECOM Technical Services, Inc. of Los Angeles, California, Tuesday, to close the remaining breaches and making final repairs on the Missouri River L-536 levee system north of Corning, Missouri.  The L-536 system is the last remaining Missouri River levee damaged by the March 2019 flood event in need of full repair.
  • City of Omaha to host scoping open house regarding Cunningham Lake recreation potential

    The City of Omaha, in conjunction with the U.S. Army Corps of Engineers Omaha District, will hold a scoping open house to seek public input on potential recreational features at Glenn Cunningham Lake Jan. 8, 2019 from 6 p.m. to 8 p.m. at the Camelot Community Center, 9270 Cady Ave.
  • Corps to hold public meeting for Langdon Bend Habitat Project in Nemaha

    The U.S. Army Corps of Engineers (Corps) will hold a public meeting on the draft project implementation report (PIR) with integrated environmental assessment (EA) for the Langdon Bend Interception and Rearing Complex Habitat Project in Nemaha County.
  • Public meetings scheduled for Denver Urban Waterways Restoration Study

    The U.S. Army Corps of Engineers, in cooperation with the city and county of Denver, will hold three public meetings to gather input on the recently initiated Denver Waterways Restoration Study. The purpose of the study is to identify ecosystem restoration and flood risk reduction opportunities along critical areas of the South Platte River from 6th Avenue to 58th Avenue and flood-prone areas of Harvard Gulch and Weir Gulch.