Missouri River Water Management News

Missouri River Water Management News Releases are available on the Northwestern Division website.RSS Feed

Results:
Category: Front Page News, Emergency Management, Emergency Operations, Contract Awards, Public Comment, Planning Projects, Schuyler FRM, Sheridan FRM, ChatfieldReallocation, Missouri Valley IA, DSMS Cherry Creek, Dead Man's Run FRM Project, M&ISurplusWater, MainstemReallocationStudy, Yellowstone, Arvada, LongmontCO, PapillionGRR, SPlatteValley, Regulatory, CO Regulatory, Moffat, NISP, Halligan, Seaman, Windy Gap, MT Regulatory, ND Regulatory, NE Regulatory, NE Hwy 12, EIS US-275, SD Regulatory, WY Regulatory, Systems Restoration Team, Water Management, Jamestown, Tri-Lakes, Cherry Creek WCPMS
Clear
  • USACE, Reclamation to co-host ribbon cutting ceremony for Lower Yellowstone diversion dam, fish passage project

    The U.S. Army Corps of Engineers, Omaha District and the U.S. Bureau of Reclamation will co-host an official ribbon cutting ceremony on July 26, at 11:00 a.m. on Joe’s Island near Glendive to celebrate the completion of the Lower Yellowstone Intake Diversion Dam Fish Passage Project. The celebration will also acknowledge Reclamation’s 120th anniversary.
  • Omaha District’s Montana Regulatory Offices prioritizing emergency permitting

    The U.S. Army Corps of Engineers, Omaha District announces that due to extensive damage caused by recent flooding, its Montana Regulatory Offices will expedite emergency permitting actions.
  • USACE, Omaha District announces Lower Yellowstone project ribbon cutting ceremony

    The U.S. Army Corps of Engineers, in conjunction with the U.S. Bureau of Reclamation will be co-hosting an official ribbon cutting ceremony for the Lower Yellowstone Intake Diversion Dam Fish Passage Project, July 26, on Joe’s Island in Montana.
  • Public comments sought for draft PEA for repairs to side channel chutes, backwaters damaged in 2019 floods

    Public comments are being sought on a draft programmatic environmental assessment has been prepared to evaluate and document the potential impacts of a suite of proposed repair activities that would occur within previously constructed Missouri River Recovery Program side channel chutes and backwaters in Nebraska, Iowa, and Missouri that were damaged by the 2019 flood event on the Missouri River. The proposed repairs are needed to repair flood damages to MRRP constructed chutes to reduce the possibility of adversely affecting other authorized purposes, or adjacent lands, and to restore beneficial habitat conditions in the chutes that were impacted by the flood.
  • Public notice for permit application for compensatory mitigation bank near Bozeman, Montana

    Missoula, Mont. –The U.S. Army Corps of Engineers, Omaha District is evaluating a request by the Sacajawea Audubon Society to review the feasibility of a new compensatory mitigation bank, known as the Indreland Audubon Wetland Preserve on the east side of the City of Bozeman, Montana. The prospectus is the first phase of mitigation bank evaluation. It is intended to determine whether the site has enough potential to warrant development of a more detailed Mitigation Banking Instrument. This notice is to inform interested parties of the proposed activity and to solicit public comments.
  • Draft supplemental environmental assessment for additional repairs to Fawn Island Chute available for public review

    A draft supplemental environmental assessment for additional repairs to the Fawn Island Chute in Harrison County, Iowa is currently available for public review.
  • USACE conducting dam safety modification study efforts at Garrison Dam in North Dakota

    OMAHA, Neb. -- The U.S. Army Corps of Engineers, Omaha District is conducting a dam safety modification study at Garrison Dam, near Riverdale, North Dakota. The study addresses risks associated with the design of the concrete spillway. These risks were identified during the 2011 Missouri River flood, when the Garrison Dam’s spillway was used for the first time in the dam’s nearly 70 year history to help control the flow of the Missouri River and lessen the impacts of severe flooding on downstream communities like Bismarck.
  • USACE, Hamburg sign first ever Section 1176 agreement allowing raise of Ditch 6 levee system

    The U.S. Army Corps of Engineers, Omaha District, and the City of Hamburg, Iowa, signed the Section 1176 project agreement Tuesday that will allow for raising the Hamburg Ditch 6 levee eight feet, significantly increasing the flood risk management benefits the levee provides to the city.
  • Virtual public meeting scheduled to discuss recently released Papillion Creek Basin draft final feasibility report

    OMAHA, Neb. – The U.S. Army Corps of Engineers, in cooperation with the Papio-Missouri River Natural Resources District, will hold a virtual public meeting Feb. 10 to present the results of the draft final feasibility report for the Papillion Creek general reevaluation study. The purpose of the study is to develop alternatives to reduce flood risks and improve public safety within the Papillion Creek Basin in Douglas, Sarpy and Washington counties.
  • Winter won't stop work on L-536 levee repairs

    Despite winter conditions, work continues on the L-536 levee setback south of Rock Port, Missouri. Repairs to the original in-line portion of the levee are scheduled to be substantially complete within the next month. Construction of the levee setback portion of the project continues despite the freezing temperatures.