USACE Omaha District Photos

Out with the old, in with the new: Bulkhead gates at Gavins Point Dam replaced for the first time
Scott Swanson, U.S. Army Corps of Engineers, Omaha District contracting officer representative for the Gavins Point Project, provides guidance and quality assurance during the replacement of powerhouse draft tube bulkhead gates October 22, 2024. (U.S. Army Corps of Engineers photo by Delanie Stafford)

Download Image: Full Size (1.97 MB)
Photo by: Delanie Stafford |  VIRIN: 241022-A-KS317-1031.JPG