Project Reports

Sewer and Water System Improvements for South Wind Community, MT

Published Sept. 12, 2019
Expiration date: 10/12/2019

Summary: Proposed improvements to the water system include connecting a water test well to a new distribution system that will consist of a well house for chlorination equipment and several hundred feet of new PVC pipe installed under an existing roadway within the Montana Department of Transportation right-of-way. Additionally, 3,000 linear feet of 6-inch diameter and 680 linear feet of 4-inch diameter PVC water mains and associated
structures such as valves and hydrants, along with a new 30,000-gallon partially-buried concrete water storage tank adjacent to the well site would be constructed.

Geographic Scope: South Wind, Cascade County, Montana

Decision/Date: Made following close of public comment period.