USACE Omaha District Photos

L-594 levee system repairs, Mar. 1, 2020
As of March 1, 2020, the entire L-594 levee system has been returned to full height. Continued repair activities will focus on restoring the levee system to its pre-flood condition.

Download Image: Full Size (4.4 MB)
Tags:
Photo by: U.S. Army Corps of Engineers Omaha District |  VIRIN: 200229-A-RI866-006.JPG